Over 21 years of experience of which 16 years in a leadership role, managed project control, project planning, cost estimation, budgeting, reporting, change management, risk management in LNG, Petrochemical, Refinery,Cement Plants and GTL Industry. Gained experience in all phases of a project from Beginning to Hand-Over. Taking responsibility for different execution roles in various multi disciplinary environments, like Integrated Teams, Construction Contractors, Main Contractors , EPC Contractor and Client alike. Worked and lived in a multitude of geographic locations and continents with exposure to some of the world’s biggest projects. Key competencies include strong analytical skill, leading multi cultural teams, strong process implementation and management, organizational ability, quick learner, delegates and carries responsibility, capable of working under pressure and meeting deadlines, excellent public relations skills and a conscious approach to HSSE
Musa Kirci
Turkiye
Adress
(+90532) 741 21 52
musakirci@yahoo.com
Project Director, Russian Projects at Ustay • April 2021
• New SRU (Sulphur Recovery Unit).
• DCU (Delayed Coker Unit).
Project Director, Russian Projects at Ustay • March 2019
• Compressor, Melt and Granulation Units.
• Pump House, Tank Storage Area, Transfer Tower and Conveying Gallery.
• PEB Building with Reclaimer.
• Bulk Loading Unit and Railway.
Project Manager • April 2007
• Ethylene and Propylene Units.
• RDGTU Unit.
• Storage Unit and Interconnecting Piperack.
• CCR and Substation Buildings.
Project Manager • March 2003
• Revamping of U 7000 Crude Oil Unit and Installation of 3 heaters.
• Installation and demolishing of process piping.
• Demolishing of Existing Crude Oil Heaters.
Project Manager • April 2007
• Utility Pipe Rack.
• Air Cooling Unit.
• Process Columns.
Project Manager • March 2003
• H2 Production Unit (Reformer). • Sulphur Recovery Unit.
Project Manager • April 2007
• H2 Production Unit (Reformer).
• Sulphur Recovery Unit.
Project Manager • March 2003
This is Photoshop's version of Lorem Ipsum. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet mauris. Morbi accumsan ipsum velit. Nam nec tellus a odio tincidunt auctor a ornare odio. Sed non mauris vitae erat
Project Manager • April 2007
Lorem ipsum dolor sit amet, consectetuer adipiscing elit. Aenean commodo ligula eget dolor. Aenean massa. Cum sociis natoque penatibus et magnis dis parturient montes, nascetur ridiculus mus. Donec quam felis, ultricies nec, pellentesque eu, pretium quis, sem. Nulla consequat massa quis enim. Donec pede justo, fringilla vel, aliquet nec, vulputate eget, arcu. Nullam dictum felis eu pede mollis pretium.
Project Manager • March 2003
This is Photoshop's version of Lorem Ipsum. Proin gravida nibh vel velit auctor aliquet. Aenean sollicitudin, lorem quis bibendum auctor, nisi elit consequat ipsum, nec sagittis sem nibh id elit. Duis sed odio sit amet nibh vulputate cursus a sit amet mauris. Morbi accumsan ipsum velit. Nam nec tellus a odio tincidunt auctor a ornare odio. Sed non mauris vitae erat
Project Manager • April 2007
• Engineering.
• Procurement.
• Construction.
Project Manager • March 2003
• Air Separation Units.
• Machine House Units and Turbines.
• Cold Box, Hex Box and DCC tanks area.
• O2 and N2 Tanks Areas.
• Reactors.
Project Manager • April 2007
• Rotary Kiln.
• Cement Mill.
• Clinker Production Unit.
• Pre heater Tower.
• Natural Gas Pressure Dropstation and Pipe Lines.
• Cooler.
• Raw Mills Unit.
Project Manager • March 2003
• Cement Mill.
• Clinker Production Unit.
• Pre heater Tower.
• Natural Gas Unit and pipe lines.
• Tanks Area.
• Cooler.
• Transfer Tower.
• Raw Mill.
Project Manager • April 2007
• Sleeper Way and Transfer Pipe Line Projects.
• Knock out drum, filters and flare area with stack.
• Propane Unit and Utilities Pipe Racks for the plant.
• Compressor Unit and Chiller Units.
• SRU Units.
• Sweetening System.
• Storage Tanks and Loading Pumps.
Project Manager • March 2003
• Supervision of prefabrication and erection for offshore and onshore piping works.
• New SRU (Sulphur Recovery Unit).
• DCU (Delayed Coker Unit)
• New SRU (Sulphur Recovery Unit).
• DCU (Delayed Coker Unit)
• New SRU (Sulphur Recovery Unit).
• DCU (Delayed Coker Unit)
• Compressor, Melt and Granulation Units.
• Pump House, Tank Storage Area, Transfer Tower and Conveying Gallery.
• PEB Building with Reclaimer.
• Bulk Loading Unit and Railway.
• Compressor, Melt and Granulation Units.
• Pump House, Tank Storage Area, Transfer Tower and Conveying Gallery.
• PEB Building with Reclaimer.
• Bulk Loading Unit and Railway.
• Compressor, Melt and Granulation Units.
• Pump House, Tank Storage Area, Transfer Tower and Conveying Gallery.
• PEB Building with Reclaimer.
• Bulk Loading Unit and Railway.
• Ethylene and Propylene Units.
• RDGTU Unit.
• Storage Unit and Interconnecting Piperack.
• CCR and Substation Buildings.
• Ethylene and Propylene Units.
• RDGTU Unit.
• Storage Unit and Interconnecting Piperack.
• CCR and Substation Buildings.
• Ethylene and Propylene Units.
• RDGTU Unit.
• Storage Unit and Interconnecting Piperack.
• CCR and Substation Buildings.
• Ethylene and Propylene Units.
• RDGTU Unit.
• Storage Unit and Interconnecting Piperack.
• CCR and Substation Buildings.
• New SRU (Sulphur Recovery Unit).
• DCU (Delayed Coker Unit)
• New SRU (Sulphur Recovery Unit).
• DCU (Delayed Coker Unit)
• New SRU (Sulphur Recovery Unit).
• DCU (Delayed Coker Unit)
• Compressor, Melt and Granulation Units.
• Pump House, Tank Storage Area, Transfer Tower and Conveying Gallery.
• PEB Building with Reclaimer.
• Bulk Loading Unit and Railway.
• Compressor, Melt and Granulation Units.
• Pump House, Tank Storage Area, Transfer Tower and Conveying Gallery.
• PEB Building with Reclaimer.
• Bulk Loading Unit and Railway.
• Compressor, Melt and Granulation Units.
• Pump House, Tank Storage Area, Transfer Tower and Conveying Gallery.
• PEB Building with Reclaimer.
• Bulk Loading Unit and Railway.
• Ethylene and Propylene Units.
• RDGTU Unit.
• Storage Unit and Interconnecting Piperack.
• CCR and Substation Buildings.
• Ethylene and Propylene Units.
• RDGTU Unit.
• Storage Unit and Interconnecting Piperack.
• CCR and Substation Buildings.
• Ethylene and Propylene Units.
• RDGTU Unit.
• Storage Unit and Interconnecting Piperack.
• CCR and Substation Buildings.
• Ethylene and Propylene Units.
• RDGTU Unit.
• Storage Unit and Interconnecting Piperack.
• CCR and Substation Buildings.